59TH ELECTED COUNCIL UPDATES – ROAD RESURFACING - Six Nations of the Grand River 59th Elected Council (SNGREC) has approved for the Public Works Department to prepare to resurface the following roads in 2025 within their current budget:Road 152 (4th Line between Mohawk and Seneca Road)

Road 157 (4th Line between Cayuga Road and railroad tracks)
Road 243 (Chiefswood Road between 2nd and 3rd Line)

(June 2, 2025) OHSWEKEN, ON – Six Nations of the Grand River 59th Elected Council (SNGREC) has approved for the Public Works Department to prepare to resurface the following roads in 2025 within their current budget:

  • Road 152 (4th Line between Mohawk and Seneca Road)
  • Road 157 (4th Line between Cayuga Road and railroad tracks)
  • Road 243 (Chiefswood Road between 2nd and 3rd Line)

Additionally, due to the rapid deterioration of the Six Nations road network, SNGREC also allocated funds from the Federal Fuel Charge Proceeds Fund for Indigenous Governments to resurface the following roads:

  • Road 274 (Cayuga Road between 3rd and 4th Line)
  • Road 265 (Onondaga Road between 4th and 5th Line)
  • Road 235 (Seneca Road between 4th and 5th Line)
  • Road 163 (5th Line between Seneca and Chiefswood Road)
  • Road 123 (1st Line between Seneca and Chiefswood Road)
  • Road 253 (Tuscarora Road between 2nd and 3rd Line)
  • Road 232 (Seneca Road between 1st and 2nd Line)
  • Road 233 (Seneca Road between 2nd and 3rd Line)
  • Road 255 (Tuscarora Road between 4th and 5th Line)

Work on the additional nine roads will commence once design and tenders are prepared and contractors are secured.

-30-

Media Contact Information: 59TH ELECTED COUNCIL UPDATES – ROAD RESURFACING
Darrien Bomberry, Public Relations Coordinator P: (226) 387-0826, 1695 Chiefswood Road, P.O. Box 5000, Ohsweken Ontario N0A 1M0